United States. National Aeronautics and Space Administration Search this
Extent:
81.71 Cubic feet (222 letter document boxes, 1 slim letter document box, 4 flatboxes)
Type:
Collection descriptions
Archival materials
Photographs
Reports
Publications
Date:
1959-1972
Summary:
This collection contains the non-book portion of Bellcomm's Technical Library. The material in the collection consists of technical reports prepared by NASA subcontractors and/or NASA facilities during the first decade of space exploration (1960-1970). The collections also includes some reports issued by the California Institute of Technology's Jet Propulsion Lab (JPL) at Pasadena, CA, including Space Program and Research Summaries, as well as technical and engineering documents.
Scope and Content Note:
This collection contains the non-book portion of Bellcomm's Technical Library. The material in the collection consists of technical reports prepared by NASA subcontractors and/or NASA facilities during the first decade of space exploration (1960-1970). The reports cover a variety of space exploration-related subjects, including a number of defunct programs and space medicine concerns, as well as the better-known exploration projects, such as Mercury, Gemini, Surveyor, and so forth. The library also includes some reports issued by the California Institute of Technology's Jet Propulsion Lab (JPL) at Pasadena, CA, including Space Program and Research Summaries, as well as technical and engineering documents.
Arrangement note:
Several attempts were made to organize the Bellcomm material before it was transferred from SS&E to the NASM Archives Division. The most thorough of these attempts left two sections of the collection independently organized by corporate author and a third unorganized section. As the proposed corporate-author organization would cause documents relating to a single program to be separated based upon which contractor submitted the report while juxtaposing completely unrelated materials, this arrangement has been discarded in favor of a subject (program or study) arrangement.
Following a series of Bibliographies and General Reports, the materials are organized into five series based upon NASA's functional organization during much of the 1960s: Launch Vehicle Programs, Manned Space Flight Programs, Space Science and Applications (Planetary Reconnaissance and Earth-Orbiting Satellites), Tracking and Data Acquisition, and Advanced Research and Technology. Materials relating to military programs follow in a separate series.
Under each series, materials are arranged by study and/or project. Materials relating to specific missions follow general material relating to the project under which the mission was launched. As no reference has surfaced to date positively linking a specific study to a specific project or program, series assignments have been made based upon the study name. The series assignments in this finding aid should not be taken to represent the actual NASA program or project under which the report was originally funded.
Series I. Bibliographies and General Reports
Series II. Launch Vehicle Programs
Series III. Manned Space Flight Programs
Series IV. Space Science and Applications
Series V. Tracking and Data Acquisition
Series VI. Advanced Research and Technology
Series VII. Military Programs and Studies
Historical note:
Bellcomm, Inc was a subsidiary of American Telephone and Telegraph (AT&T) established in 1963 for the National Aeronautics and Space Administration (NASA). Bellcomm was originally organized to provide NASA's Office of Manned Space Flight with technical and management advice for the Manned Space Flight Program. As the NASA-Bellcomm relationship evolved, the latter became directly responsible for systems engineering and analysis and assisted in the overall spacecraft integration for the Apollo program. Bellcomm's Technical Library provided company personnel with immediate access to technical reports and studies dealing with a wide variety of topics affecting the American space program. When the Apollo Program ended in 1972 the company also ceased operation and the library was transferred to the National Air and Space Museum (NASM).
Corporate Abbreviations:
ACM -- Allis-Chalmers Manufacturing Co
ACM/RD -- ACM, Research Division
Aerospace -- The Aerospace Corp
Aerospace/ETRO -- Aerospace Corp, Eastern Test Range Office
Aerospace/GLSD -- Aerospace, Gemini Launch Systems Directorate (El Segundo Technical Operations)
Aerospace/SEO -- Aerospace, Systems Engineering Operations
Aerospace/SSO -- Aerospace, Special Studies Office (System Planning Division, El Segundo Technical Operations)
AFAEDC -- United States Air Force, Arnold Engineering Development Center
AFCRL -- United States Air Force, Cambridge Research Laboratories
AFETR -- United States Air Force, Eastern Test Range (Canaveral AFS, FL)
AFMTC -- United States Air Force, Missile Test Center (Patrick AFB, FL)
AFSC -- United States Air Force, Air Force Systems Command
AFSC/ARML -- AFSC, 6570th Aerospace Medical Research Laboratory (Aerospace Medical Division)
AFSC/ESD -- AFSC, Electronic Systems Division
AFSC/FDL -- AFSC, Flight Dynamics Laboratory (Aeronautical Systems Division)
AFSC/SAM -- AFSC, School of Aerospace Medicine (Aerospace Medical Division)
AGC -- Aerojet-General Corp
AGC/LRO -- AGC, Liquid Rocket Operations
AGC/SGC -- AGC, Space-General Corp
Allison/ED -- Allison, Engineering Department
ARMC -- AiResearch Manufacturing Co.
Avco -- Avco Corp
Avco/ERL -- Avco, Everett Research Laboratories
Avco/RAD -- Avco, Research and Advanced Development Division
BBRC -- Ball Brothers Research Corp
Bell -- Bell Aerospace Corp (Textron)
Bell/BAC -- Bell, Bell Aerosystems Co
Bell Labs -- Bell Telephone Laboratories
Bendix/ASD -- Bendix Corp, Aerospace Systems Division
UAC/HS -- United Aircraft Corp, Hamilton Standard Division
UC -- Union Carbide Corp
UC/ADD -- UC, Advanced Developments Division
USACE/AMS -- United States Army Corps of Engineers, Army Map Service
USAEWES -- United States Army Engineer Waterways Experiment Station
USATEC/YPG -- United States Army Test and Evaluation Command, Yuma Proving Ground
USDC/CFSTI -- United States Department of Commerce, Clearinghouse for Federal Scientific and Technical Information (Institute for Applied Technology, National Bureau of Standards)
USDoD -- United States Department of Defence
USN/BuWeps -- United States Navy, Bureau of Naval Weapons
USN/OO -- United States Navy, Oceanography Office
Westinghouse/DSC -- Westinghouse, Defense and Space Center
Westinghouse/DSC/SOD -- Westinghouse/DSC, Systems Operation Division
Project Mercury Launches:
MissionLaunch DateLaunch vehiclePayloadRemarksLJ-121 Aug 1959Little JoeMercury boiler plateunsuccessful beach test of LESBig Joe 19 Sep 1959Big JoeMercury boiler plateLJ-64 Oct 1959Little JoeMercury boiler plateLJ-1A4 Nov 1959Little JoeMercury boiler platerepeat of LJ-1LJ-24 Dec 1959Little JoeMercury boiler platehigh-altitude LES testLJ-1B21 Jan 1960Little JoeMercury boiler platebeach abort w/rhesus (Miss Sam)MA-129 Jul 1960AtlasMercury s/c 4launch vehicle failureLJ-58 Nov 1960Little JoeMercury s/c 3unsuccessful test of LESMR-121 Nov 1960RedstoneMercury s/c 2premature booster cut-offMR-1A19 Dec 1960RedstoneMercury s/c 2suborbital reentry testMR-23 Jan 1961RedstoneMercury s/c 5suborbital w/chimp (Ham)MA-221 Feb 1961AtlasMercury s/c 6suborbital testLJ-5A18 Mar 1961Little JoeMercury s/c 14unsuccessful test of LESMR-BD24 Mar 1961RedstoneLV qualified for manned flightMA-325 Apr 1961AtlasMercury s/c 8launch vehicle failureLJ-5B28 Apr 1961Little JoeMercury s/c 14successful LES testMR-35 May 1961Redstone 7Mercury s/c 7suborbital; Shepard, "Freedom 7"MR-421 Jul 1961Redstone 8Mercury s/c 11suborbital; Grissom, "Liberty Bell 7"MA-413 Sep 1961AtlasMercury s/c 8orbital test of tracking networkMA-52 Nov 1961AtlasMercury s/c 92 orbits w/chimp (Enos)MA-620 Feb 1962Atlas 109-DMercury s/c 133 orbits; Glenn, "Friendship 7"MA-724 May 1962Atlas 107-DMercury s/c 183 orbits; Carpenter, "Aurora 7"MA-83 Oct 1962Atlas 113-DMercury s/c 166 orbits; Schirra, "Sigma 7"MA-915 May 1963Atlas 130-DMercury s/c 2022 orbits; Cooper, "Faith 7"
MissionLaunch DateLaunch vehiclePayloadRemarksMR-35 May 1961Redstone 7Mercury s/c 7suborbital; Shepard, "Freedom 7"MR-421 Jul 1961Redstone 8Mercury s/c 11suborbital; Grissom, "Liberty Bell 7"MA-620 Feb 1962Atlas 109-DMercury s/c 133 orbits; Glenn, "Friendship 7"MA-724 May 1962Atlas 107-DMercury s/c 183 orbits; Carpenter, "Aurora 7"MA-83 Oct 1962Atlas 113-DMercury s/c 166 orbits; Schirra, "Sigma 7"MA-915 May 1963Atlas 130-DMercury s/c 2022 orbits; Cooper, "Faith 7"
MissionLaunch DateLaunch vehiclePayloadRemarksBig Joe 19 Sep 1959Big JoeMercury boiler plate
MissionLaunch DateLaunch vehiclePayloadRemarksLJ-121 Aug 1959Little JoeMercury boiler plateunsuccessful beach test of LESLJ-1A4 Nov 1959Little JoeMercury boiler platerepeat of LJ-1LJ-1B21 Jan 1960Little JoeMercury boiler platebeach abort w/rhesus (Miss Sam)LJ-24 Dec 1959Little JoeMercury boiler platehigh-altitude LES testLJ-58 Nov 1960Little JoeMercury s/c 3unsuccessful test of LESLJ-5A18 Mar 1961Little JoeMercury s/c 14unsuccessful test of LESLJ-5B28 Apr 1961Little JoeMercury s/c 14successful LES testLJ-64 Oct 1959Little JoeMercury boiler plate
MissionLaunch DateLaunch vehiclePayloadRemarksMA-129 Jul 1960AtlasMercury s/c 4launch vehicle failureMA-221 Feb 1961AtlasMercury s/c 6suborbital testMA-325 Apr 1961AtlasMercury s/c 8launch vehicle failureMA-413 Sep 1961AtlasMercury s/c 8orbit test of tracking networkMA-52 Nov 1961AtlasMercury s/c 92 orbits w/chimp (Enos)MA-620 Feb 1962Atlas 109-DMercury s/c 133 orbits; Glenn, "Friendship 7"MA-724 May 1962Atlas 107-DMercury s/c 183 orbits; Carpenter, "Aurora 7"MA-83 Oct 1962Atlas 113-DMercury s/c 166 orbits; Schirra, "Sigma 7"
MissionLaunch DateLaunch vehiclePayloadRemarksMR-121 Nov 1960RedstoneMercury s/c 2premature booster cut-offMR-1A19 Dec 1960RedstoneMercury s/c 2suborbital reentry testMR-23 Jan 1961RedstoneMercury s/c 5suborbital w/chimp (Ham)MR-BD24 Mar 1961RedstoneLV qualified for manned flightMR-35 May 1961Redstone 7Mercury s/c 7suborbital; Shepard, "Freedom 7"MR-421 Jul 1961Redstone 8Mercury s/c 11suborbital; Grissom, "Liberty Bell 7"
PayloadMissionLaunch DateLaunch vehicleRemarksMercury s/c 19 May 1960beach abort testMercury s/c 2MR-121 Nov 1960Redstonepremature booster cut-offMR-1A19 Dec 1960Redstonesuborbital reentry testMercury s/c 3LJ-58 Nov 1960Little Joeunsuccessful test of LESMercury s/c 4MA-129 Jul 1960Atlaslaunch vehicle failureMercury s/c 5MR-23 Jan 1961Redstonesuborbital w/chimp (Ham)Merucry s/c 6MA-221 Feb 1961Atlassuborbital testMercury s/c 7MR-35 May 1961Redstone 7suborbital; Shepard, "Freedom 7"Mercury s/c 8MA-325 Apr 1961Atlaslaunch vehicle failureMA-413 Sep 1961Atlasorbital test of tracking networkMercury s/c 9MA-52 Nov 1961Atlas2 orbits w/chimp (Enos)Merucry s/c 10environmental test, St.LouisMercury s/c 11MR-421 Jul 1961Redstone 8suborbital; Grissom, "Liberty Bell 7"Mercury s/c 12mission cancelled; not deliveredMercury s/c 13MA-620 Feb 1962Atlas 109-D3 orbits; Glenn, "Friendship 7"Mercury s/c 14LJ-5A18 Mar 1961Little Joeunsuccessful test of LESLJ-5B28 Apr 1961Little Joesuccessful LES testMercury s/c 15mission cancelled; not deliveredMercury s/c 16MA-83 Oct 1962Atlas 113-D6 orbits; Schirra, "Sigma 7"Mercury s/c 17parts supportMercury s/c 18MA-724 May 1962Atlas 107-D3 orbits; Carpenter, "Aurora 7"Mercury s/c 19mission cancelled; not deliveredMercury s/c 20MA-915 May 1963Atlas 130-D22 orbits; Cooper, "Faith 7"
Project Gemini Launches:
MissionLaunch DateLaunch vehiclePayloadRemarksGT-18 Apr 1964GLV-1Gemini s/c 1unmanned orbital test of GLV & s/cGT-219 Jan 1965GLV-2Gemini s/c 2unmanned suborbital reentry testGT-323 Mar 1965GLV-3Gemini 3Grissom & Young, "Molly Brown"GT-43 Jun 1965GLV-4Gemini 4McDivitt & White; first EVAGT-521 Aug 1965GLV-5Gemini 5Cooper & ConradGT-6A15 Dec 1965GLV-6Gemini 6Schirra & StaffordGT-74 Dec 1965GLV-7Gemini 7Borman & LovellGT-816 Mar 1966GLV-8Gemini 8Armstrong & Scott16 Mar 1966TLV-5302GATV-5003Agena target vehicle for GT-8GT-9A3 Jun 1966GLV-9Gemini 9Stafford & Cernan1 Jun 1966TLV-5304ATDAdocking target for GT-9AGT-1018 Jul 1966GLV-10Gemini 10Young & Collins18 Jul 1966TLV-5305GATV-5005Agena target vehicle for GT-10GT-1112 Sep 1966GLV-11Gemini 11Conrad & Gordon12 Sep 1966TLV-5306GATV-5005Agena target vehicle for GT-11GT-1211 Nov 1966GLV-12Gemini 12Lovell & Aldrin11 Nov 1966TLV-5307GATV-5001Agena target vehicle for GT-12
Saturn/Apollo Program Launches:
MissionLaunch DateLaunch vehiclePayloadRemarksSA-127 Oct 1961Saturn Idummy second stageSA-225 Apr 1962Saturn Idummy second stageProject HighwaterSA-316 Nov 1962Saturn Idummy second stageProject HighwaterSA-428 Mar 1963Saturn Idummy second stageSA-529 Jan 1964Saturn ISA-628 May 1964Saturn IBP-3SA-718 Sep 1964Saturn IBP-15Saturn I declared operationalSA-825 May 1965Saturn IBP- ; Pegasus 2SA-916 Feb 1965Saturn IBP- ; Pegasus 1SA-1030 Jul 1965Saturn IBP- ; Pegasus 3last Saturn I launch
MissionLaunch DateLaunch vehiclePayloadRemarksA-00113 May 1964Little Joe IIBP-12suborbital LES testA-0028 Dec 1964Little Joe IIBP-23LES testA-00319 May 1965Little Joe IIBP-22LES testA-00420 Jan 1966Little Joe IICSM-002LES testA-101see SA-6 (Saturn development launch)A-102see SA-7 (Saturn development launch)AS-20126 Feb 1966SA-201 (Sat IB)CSM-009suborbital test of Apollo heat shieldAS-20225 Aug 1966SA-202 (Sat IB)CSM-011test of Apollo heat shieldAS-2035 Jul 1966SA-203 (Sat IB)no spacecraftAS-204not launchedSA-204 (Sat IB)CSM-012Apollo 1; CM des by fire 27 Jan 1967AS-20422 Jan 1968SA-204 (Sat IB)aero fairing; LM-1Apollo 5; unmanned launch with LMAS-20511 Oct 1968SA-205 (Sat IB)CSM-101Apollo 7; first manned Apollo launchAS-5019 Nov 1967SA-501 (Sat V)CSM-017, LTA-10RApollo 4AS-5024 Apr 1968SA-502 (Sat V)CM-020, SM-014, LTA-2RApollo 6AS-50321 Dec 1968SA-503 (Sat V)CSM-103Apollo 8; first lunar orbital flightAS-5043 Mar 1969SA-504 (Sat V)CSM-104, LM-3Apollo 9AS-50518 May 1969SA-505 (Sat V)CSM-106, LM-4Apollo 10AS-50616 Jul 1969SA-506 (Sat V)CSM-107, LM-5Apollo 11; first lunar landingAS-50714 Nov 1969SA-507 (Sat V)CSM-108, LM-6Apollo 12AS-50811 Apr 1970-04SA-508 (Sat V)CSM-109, LM-7Apollo 13AS-50931 Jan 1971SA-509 (Sat V)CSM-110, LM-8Apollo 14AS-51026 Jul 1971SA-510 (Sat V)CSM-112, LM-10, LRV-1Apollo 15AS-51116 Apr 1972SA-511 (Sat V)CSM-113, LM-11, LRV-2Apollo 16AS-5127 Dec 1972SA-512 (Sat V)CSM-114, LM-12, LRV-3Apollo 17; last lunar landing mission
MissionLaunch VehicleCommand ModuleLunar ModuleLaunch DateRemarksApollo 1SA-204CSM-204not launchedAS-204Sat IBCM destroyed by fire 27 Jan 1967Apollo 4SA-501CSM-0179 Nov 1967AS-501Sat VApollo 5SA-204aerodynamic fairingLM-122 Jan 1968AS-204Sat IBunmanned launchApollo 6SA-502CSM-0204 Apr 1968AS-502Sat Vunmanned launchApollo 7SA-205CSM-10111 Oct 1968AS-205Sat IBfirst manned Apollo launchApollo 8SA-503CSM-10321 Dec 1968AS-503Sat Vfirst manned lunar orbital flightApollo 9SA-504CSM-104LM-3 "Spider"3 Mar 1969AS-504Sat V"Gumdrop"Apollo 10SA-505CSM-106LM-4 "Snoopy"18 May 1969AS-505Sat V"Charlie Brown"Apollo 11SA-506CSM-107LM-5 "Eagle"16 Jul 1969AS-506Sat V"Columbia"first manned lunar landingApollo 12SA-507CSM-108LM-6 "Intrepid"14 nov 1969AS-507Sat V"Yankee Clipper"Apollo 13SA-508CSM-109LM-7 "Aquarius"11 Apr 1970AS-508Sat V"Odyssey"landing cancelled due to in-flight explosionApollo 14SA-509CSM-110LM-8 "Antares"31 Jan 1971AS-509Sat V"Kitty Hawk"Apollo 15SA-510CSM-112LM-10 "Falcon"26 Jul 1971AS-510Sat V"Endeavour"LRV-1Apollo 16SA-511CSM-113LM-11 "Orion"16 Apr 1972AS-511Sat V"Casper"LRV-2Apollo 17SA-512CSM-114LM-12 "Challenger"7 dec 1972AS-512Sat V"America:LRV-3last lunar landing mission
Provenance:
Bellcomm, Inc, transfer, XXXX-0093, unknown
Restrictions:
No restrictions on access
Rights:
Material is subject to Smithsonian Terms of Use. Should you wish to use NASM material in any medium, please submit an Application for Permission to Reproduce NASM Material, available at Permission Requests.
United States. National Aeronautics and Space Administration Search this
Extent:
13.08 Cubic feet ((12 records center boxes))
Type:
Collection descriptions
Archival materials
Manuals
Press releases
Publications
Photographs
Place:
Outer space -- Exploration
Date:
1950-1974
bulk 1959-1974
Scope and Contents:
This collection consists of material gathered by the Space Science and Exploration Department, National Air and Space Museum, relating to the United States space program through the Skylab missions. The material consists of photos and reference material covering a wide variety of subjects, including space suits, food, lifting bodies, and other support and auxiliary functions, as well as material directly relating to the missions. The bulk of the material consists of photos and NASA press materials.
Biographical / Historical:
The National Aeronautics and Space Administration (NASA) was inaugurated on 1 October 1958 with the intent of conducting a manned space program. NASA took over the rocketry and propulsion work previously performed by the United States Air Force, Navy, and National Advisory Committee for Aeronautics. Unmanned launches began during the International Geophysical Year (1957-58) under Air Force auspices and have continued to the present with a wide variety of payloads, including space science, weather, communications, and earth observation satellites. The manned program progressed through Projects Mercury (1959-63; launches 1961-63), Gemini (1962-67; launches 1965-66), Apollo (1960-72; launches 1968-72), and Skylab (1969-74; launches 1973-74). The manned program was supported by a number of unmanned exploration vehicles in the Ranger, Lunar Orbiter, and Surveyor series throughout the 1960s, as well as research into a number of related areas.
General:
NASMrev
Provenance:
NASA SS&E, Transfer, 1983, XXXX-0154, unknown
Restrictions:
No restrictions on access
Rights:
Material is subject to Smithsonian Terms of Use. Should you wish to use NASM material in any medium, please submit an Application for Permission to Reproduce NASM Material, available at Permissions Requests