17 documents - page 1 of 1
Peter Howard Selz papers, 1929-2014, bulk 1950-2005
Oral history interview with Leo Holub, 1997 July 3
Oral history interview with Leo Holub
Parsons, Brinckerhoff, Quade and Douglas Records
Performance demonstration of the alternating current propulsion system for the San Francisco Bay Area Rapid Transit District: final report
Automatic train control / prepared by PBTB
Rockwell truck development for Bay Area Rapid Transit District; final report
BART demonstration report, prepared by F.E. Bonn [and others]
Automatic train control system
Test and demonstration of automatic train control for San Francisco Bay Area Rapid Transit District; final report
Test report on General 70-E trucks; applied to San Francisco Bay Area Rapid Transit Laboratory car "C" - Series I
Analysis and evaluation report: Commuta-Code automatic fare collection equipment, prepared by General Electric Company, Meter Department, for Parsons Brinckerhoff-Tudor-Bechtel, consulting engineers to the Bay Area Rapid Transit District, San Francisco, California
Final report on tests conducted on the WABCO transit truck for the Bay Area Rapid Transit District [Prepared for Parsons, Brinckerhoff/Tudor/Bechtel, San Francisco, California]
Demonstration report covering 1000 volt D.C. chopper control system with type 1459 motors : and 4160 volt, 3 phase, 60 cycles A.C. Varitran control system with type 1459-T tandem motor units
Truck contract Z 401; phase V: field testing and final report. Prepared by B. Labaree